NAD83 COORDINATES (1986 adj.): |
---|
X= 576213.644 Y= 155483.729 Z= 000.00 CMP 12/17/1991 |
7/30/2007 | Fd monument. Photos taken. |
3/1/1991 | (Unknown date Mar __, 1991 ) Located by traverse (single stub) and placed ties. See FB 1713 p.20,21 |
9/1/1966 | (Unknown date Sep __, 1966 ) Corps of Engs recovered a Std Brass Cap stamped "US HL 8 Reset" set in 5" dia concrete, 0.6 ft above grade. |
Above is NOT an all inclusive history of this point. Please review all the links below.
PLS NOTES | Field | Cross Section | Sewer | J.B. Irvine | Monument | River Survey |
---|---|---|---|---|---|---|
  | FB 1307p.08 |   |   |   |   |   |
  | FB 1395p.02 |   |   |   |   |   |
  | FB 1713p. 20 ,21 ,25 ,26 ,28 |   |   |   |   |   |
  | FB 1713p. 30 ,32 ,35 ,37 ,38 |   |   |   |   |   |
FILE | PHOTO DATE | COMMENTS |
---|---|---|
1956-US8R-8.jpg | July 30, 2007 | Looking Northwest across the river, mon. in foreground. |
1956-US8R-7.jpg | July 30, 2007 | Looking West (upstream), mon. in foreground. |
1956-US8R-6.jpg | July 30, 2007 | Looking South across the river, mon. in foreground. |
1956-US8R-5.jpg | July 30, 2007 | Looking East (downstream), mon. in foreground. |
1956-US8R-4.jpg | July 30, 2007 | Looking Northeast across the river, mon. in foreground. |
1956-US8R-3.jpg | July 30, 2007 | Looking Northeast across the river, mon. in foreground. |
1956-US8R-2.jpg | July 30, 2007 | Looking North across the river, mon. in foreground. |
1956-US8R-1.jpg | July 30, 2007 | Close-up of rebar mon. in hole, aprx. 1' below grade. |