8/21/2006 | Concrete pavement removed. Dug 2' dia hole, dug 2' feet deep, probed an addtional 2'. No monument found. |
5/27/1889 | Monument set from survey by J H Armstrong. see FB 276 |
Above is NOT an all inclusive history of this point. Please review all the links below.
PLS NOTES | Field | Cross Section | Sewer | J.B. Irvine | Monument | River Survey |
---|---|---|---|---|---|---|
  | FB 0276CPYp.09 |   |   |   |   |   |