1/1/1891 | (Unknown date ___ __, 1891 ) Monument set by C A Winslow |
1/1/1890 | (Unknown date abt __, 189? ) J B Irvines survey on the 1/4 line on Case. See JBI 23 p.11-12 |
Above is NOT an all inclusive history of this point. Please review all the links below.
PLS NOTES | Field | Cross Section | Sewer | J.B. Irvine | Monument | River Survey |
---|---|---|---|---|---|---|
  |   |   |   | JBI 02 p.11-12 |   |   |